Wastewater Management

Municipal Waste Water Management Projects

Recent Projects
Haryana STP Projects
image 1
image 2
 click to view larger picture
 

PROJECT DETAILS

  • Plant Capacity : –120 MLD
  • Start Date :- 22nd March 2012
  • Completion Date :- 31st May 2015
  • Project technology : Activated Sludge Process
  • Modern Sewage Treatment Plant for Haryana Urban Development Authority (HUDA) at Behrampur
  • Project includes a 120 MLD sewage treatment plant with power generation system and 30 MLD Tertiary Treatment Plant
  • Operation and Maintenance of the facilities for a period of 6 years after completion
Chennai STP Project
image 1
image 2
 click to view larger picture
 

PROJECT DETAILS

  • Plant Capacity :– 120 MLD
  • Start Date :- 15th June 2012
  • Completion Date :- 30th June 2015
  • Project technology :- Conventional Activated Sludge Process
  • Modern CASP STP with diffused aerator and power generation using bio-gas for Chennai Metropolitan Water Supply & Sewerage Board at Koyambedu, Chennai
  • Project includes a 120 MLD STP with power generation system using two nos. of 835 KW CHP Engines
  • Operation and Maintenance of the facilities for a period of 5 years after completion
Bangalore STP Project
image 1
image 2
image 3
 click to view larger picture
 

PROJECT DETAILS

  • Plant Scope :
    • EPC of 3 Nos of STPs :
      • 1 Nos of 40 MLD STP based on Extended Aeration (EA) with Biological Nutrient Removal at Raja Canal
      • 2 Nos of 20 MLD STP based on Sequencing Batch Reactors (SBR) with Biological Nutrient Removal at Horamavu Agara and Nagasandra
      • 2 Nos of Intermediate Sewage Pumping Station of 52 MLD and 16 MLD
  • Start Date :- 28th October 2013
  • Expected Completion Date :- 28th April 2016
  • Operation and Maintenance of the facilities for a period of 7 years after completion
  • Project being executed for Bangalore Water Supply and Sewerage Board under funds sanctioned by Japan International Cooperation Agency (JICA) of Japan.
Vietnam STP Project
image 1
image 2
image 3
image 4
 click to view larger picture
 

PROJECT DETAILS

  • Plant Capacity : – 25 MLD of Domestic Waste water treatment plant and 5 MLD of Fish processing water treatment plant
  • Start Date :- May 2015
  • Completion Date :- August 2016
  • Project technology: Extended aeration activated sludge process with secondary clarification units
  • Project scope includes upgrading of existing SonTra Wastewater Treatment Plant to treat the raw domestic wastewater and Fish waste using Biological Treatment method via equalization, screening, pre-treatment, Disinfection, Sludge holding and dewatering, Odor control system.
  • O&M of the facilities for a period of 5 years
  • Project being implemented by Danang Priority Infrastructure Investment Project Mgmt Unit with funding by World Bank
ILKAL Sewerage Project
image 1
image 2
image 3
 click to view larger picture
 

PROJECT DETAILS

  • Project scope includes
    • Establishment of Sewerage collection network District -1,2 & 3 of 70 Kms
    • Establishment of 8 MLD FAL type STP including rising mains and Sewage pumping station
    • Providing 4200 nos. of house /commercial service receiving chamber connections.
  • Start Date :- March 2014
  • Completion Date :- Under Execution
  • Operation and Maintenance of the facilities for a period of 1 years after completion
  • Project funded by Asian Development Bank under North Karnataka Urban Sector Investment Program
Sindhanur Sewerage Project
image 1
image 2
image 3
 click to view larger picture
 

PROJECT DETAILS

  • Project scope includes
    • Establishment of 122 Kms Sewerage collection network
    • Establishment of 12 MLD FAL type STP including rising mains and Sewage pumping station
    • Providing 4500 nos. of house /commercial service receiving chamber connections.
  • Start Date :- February 2015
  • Completion Date :- Under Execution
  • Operation and Maintenance of the facilities for a period of 1 years after completion
  • Project funded by Asian Development Bank under North Karnataka Urban Sector Investment Program
Vasai Virar Sewerage Project
image 1
image 2
image 3
 click to view larger picture
 

PROJECT DETAILS

  • Project scope includes
    • Establishment of 52 Kms RCC Sewerage collection network
    • Establishment of 16 MLD and 39 MLD MBBR type STP Construction of 2 Nos of sewage pumping station
  • Start Date :- May 2013
  • Completion Date :- Under Execution
  • Modern Moving Bed Bio-rector based STP for Vasai Virar Municipal Corporation at Mumbai
  • Reuse of the treated water via distribution through 9 kms of HDPE pipeline

Tatva's Municipal Wastewater Management Projects
Ahmedabad Urban Development Corporation (AUDA) - Sewage Treatment Plant

Tatva is setting up a remarkable project of 240 MLD capacity sewage treatment plant (STP) for AUDA in Ahmedabad, Gujarat based on the conventional mode of treatment, i.e. activated sludge process followed by secondary clarifier. This STP has been segregated in 4 modules, each having a capacity of 60 MLD average, and 135 MLD peak flow.

Each module has its own primary & secondary treatment section, along with sludge thickening & digestion facilities. Also, available are common facilities for disinfection of biologically treated water, biogas collection & flaring, supernatant/filtrate collection & recirculation system, collection of digested sludge & digested sludge dewatering system, along with common chemical preparation & dosing facilities.

Treated sewage, as per the prescribed norms, shall be disposed off into the nearby Sabarmati river.

Parameters 
(ppm)

In let
Values

Out-let values

BOD

215

20

COD

415

100

Ganga Pollution Control Unit, Uttrakhand Pey Jal Nigam - Sewage Treatment Plant.

Tatva has set up a 27 MLD capacity Sewage Treatment Plant (STP) based on the ASP followed by Sequential Batch Reactor (SBR) technology, in Haridwar, Uttaranchal for the treatment of sewage generated at Ganges river after the Kumbh Mela.

The technology is based on cyclic activated sludge process, using fine bubble diffused aeration system to provide the required oxygen and to keep the C-Tech basins contents in a completely mixed state. It provides the highest treatment efficiency possible in a single step biological process. Treatment system is operated in a batch reactor mode, which eliminates all the inefficiencies of continuous processes. Two or more modules are provided to ensure continuous treatment. The complete process takes place in a single reactor, within which all biological treatment steps take place sequentially.
This technology gives 50% reduction in power consumption and land requirement & provides excellent quality of treated sewage.

Parameters 
(ppm)

In let
Values

Out-let values

BOD

250

<20

COD

450

<=250

Municipal Corporation of Delhi - Waste Water Treatment Plant

Tatva has set up a wastewater treatment plant using the technology of DAF (Dissolved Air Flotation) followed by UASB, AB process, chlorination & dual media filtration, with a capacity of 1.75 MLD, for the treatment of waste water generated from the slaughter house at the food processing complex of the Municipal Corporation of Delhi in Ghazipur.

As wastewater contains high suspended solids, a fine screen has been provided to remove the floating impurities. This is followed by raw water collection & pumping, dissolved air floatation & finally wastewater equalization. The waste water is treated with an up-flow Anaerobic Sludge Blanket technology, which has a compact plant design, less capital cost, less power consumption, low sludge production and produces methane energy as a byproduct. This treated wastewater will then be reused for the irrigation and development of the green belt around the facility.

Parameters 
(ppm)

In let
Values

Out-let values

BOD

6500

<30

COD

12000

<250

Hindustan Construction Company (Lavasa Corporation) - Sewage Treatment Plant (Recycle plant)

Tatva has set up a 2.4 MLD capacity Sewage Treatment Plant in Dasve village for Lavasa Corporation, Pune, to treat the domestic sewage produced from the housing resort using the Activated Sludge Process technology. Part of the treated sewage is being recycled for domestic secondary use like flushing and gardening.

This is the first Sewage Treatment Plant (STP) of its kind in India where sewage is given such a comprehensive secondary as well as tertiary treatment, and where multiple treatments are provided for disinfection before reuse.

Sewage Treatment Plant at Nerul, Navi Mumbai

Based on the Cyclic Activated Sludge process, this plant has been set up for a municipal corporation and has a capacity of 100 MLD. This plant is based on the PLC automation system.




SolidWasteManagement

Solid waste can broadly be classified into two categories.

Water Supply Management

Throughout the developing world, the provision of water supply ...

Waste-to-Energy

Waste-to-energy or energy-from-waste is the process ...