Tatva has completed design, construction of engineered sanitary landfill at three different locations for Oman Environmental Services Holding Co. ( S.A.O.C)

Engineered Landfill at Barka
image 14
image 16
 click to view larger picture
 

Engineered Landfill at Barka
Project Completion : 28.12.2014
Contract Value : OMR 3,895,348.00
Area of Landfill : 97,500 sq.m
Volume of Waste to be accommodated : 1.5 Million M3
Design Standard : USEPA

Engineered Landfill at Tahwa
image 14
 click to view larger picture
 

Project Completion : 07.04.2015
Contract Value : OMR 1,219,494.00
Area of Landfill : 30,845 sq.m
Volume of Waste to be accommodated : 0.11 million M3
Design Standard : USEPA

Engineered Landfill at Sohar
image 14
 click to view larger picture
 

Project Completion : 19.10.2015
Contract Value : OMR 3,749,995.00
Area of Landfill : 1,11,786 sq.m
Volume of Waste to be accommodated : 1.8 million M3
Design Standard : USEPA

ON-GOING PROJECTS

Engineered Landfill at IBRI
image 14
 click to view larger picture
 

Expected Project Completion Date : 31.10.2016
Contract Value : OMR 4,121,598.00
Area of Site : 95,000 m2
Client: Oman Environmental Services Holding Co
Design Standard : USEPA

Engineered Landfill at IBRI
image 14
 click to view larger picture
 

Expected Project Completion Date : 09.08.2016
Contract Value : OMR 7,048,657.00
Area of Site : 83,3000 m2 ( Municipal waste ) + 10,000 m2 ( Industrial waste )
Client: Special Economic Zone Authority At Duqm
Design Standard : USEPA

EPC for relocation of Hazardous and Non-Hzardous Waste Storage Facility at Orpic
image 14
 click to view larger picture
 

Expected Project Completion Date : 26.03.2016
Contract Value : OMR 248,555.00
Area of Site : 27,000 m2
Waste Storage Area : 14000 m2 (Single and Non-Liner system)
Client: Oman Oil Refineries and Petroleum Industries Co.



Projects
Landfill Closure of Gorai Dumping Ground, Mumbai.
image 14
image 16
image 17
 click to view larger picture
 

This project was awarded by the MCGM. The dumpsite is located in a western suburb of Mumbai, and is spread over an area of 19.6 hectares. When MCGM awarded the project, the total quantity of Municipal Solid Waste (MSW) and C&D (Construction & Debris) waste stored at the site was estimated to be 2.34 million tons.

The work done for the Gorai Project can be divided into two broad categories: (i) Work relating to the closure and capping of the Gorai dumpsite; and (ii) Work relating to the operation and maintenance of the capped dumpsite for a period of fifteen years.

Integrated Waste Management Project at Coimbatore.
image 14
image 15
image 16
 click to view larger picture
 

This PPP project is a BOOT basis project for a period of 20 years and has been approved under Jawaharlal Nehru Urban Renewal Mission (JNNURM) scheme of the Govt. of India.  

Tatva has done development, design, engineering, finance, construction, implementation, operation and maintenance of: transfer stations, transportation of Municipal Solid Waste (MSW) from transfer station to waste processing & disposal site, closure of existing dumpsites, and processing & disposal facility of treating 400 tons of waste generated from Coimbatore in the State of Tamil Nadu.

For the Coimbatore projects waste dumpsites have been created at:

 

 

Total site area

1

Kavundampalayam

34.52 acres

2

Ondipudur

3.5 acres

3

Vellalore

643 acres

 

City Industrial Development Corporation (CIDCO), New Mumbai

Tatva has executed the project of development, maintenance & operation of waste processing for a period of 3 years for CIDCO, at Chal near Taloja MIDC, as per MSW Rules 2000 on a BOOT Basis. Tatva has utilized the Windrow Technology for Composting. The capacity of the compost plant is 55 MT per day & for the landfill is 15.5 years with a total area of 14 hectares.

National Building Construction Corporation Limited (NBCC), New Delhi

Tatva is executing a project for providing, testing, and commissioning of 100 TPD Municipal Solid Waste (MSW) compost plant and Vermi composting in Jodhpur, Rajasthan on BOOT basis. With a total area of 48 acres to work with, Tatva will be using Windrow Technology and Vermiculture for the project.  The project will include providing all mechanical, electrical, hydraulic accessories etc., including 5 years of operation & maintenance.

Deonar Municipal solid waste Project at Deonar, Mumbai.

The project was awarded to a consortium, which formed a Special purpose vehicle (SPV) by the name of "Tatva Global Environment (Deonar) Limited" to execute this Integrated Waste Management facility in Deonar, Mumbai.

The existing landfill at Deonar covers a total of 132 hectares, of which approximately 120 hectares have been used for waste disposal. The overall management plan for site has the following components:

Tatva's activities in Deonar consist of

  • Operation and Maintenance of all the processing facilities and partial closure area throughout the period of concession of 25 years.
  • Partial closure within 2 years while continuing to receive Municipal Solid Waste (MSW) to the tune of 5,500 TPD and silt at the rate of 9,000 TPD (6,000 cum) per day for 75 days during the first year.
  • Creating basic infrastructure and undertaking site development works such as peripheral bund, boundary wall/fencing, roads, storm water drains, water supply, electrification, office building, landscaping, etc.
  • Creating a new MSW processing facility (composting technology or its variant) with leachate collection and primary treatment facility (centralized).
  • Creating two separate landfill facilities for: (i) disposal of rejects from the processing facility (ii) emergency operation by MCGM. It is anticipated that the leachate from all the two landfill facilities will be treated on-site in a centralized primary treatment facility. Emergency landfill will be designed in a manner such that after 3 years of operations, it can be integrated with the landfill for receiving rejects.

Water Supply Management

Throughout the developing world, the provision of water supply ...

Wastewater Management

Urban water supply and sanitation are important basic needs ...

Waste-to-Energy

Waste-to-energy or energy-from-waste is the process ...